In 2010 Balfour Beatty Mott Macdonald Joint Venture, the appointed Highways Agency Technical Maintenance contractor in Area 4 in Kent, introduced a safety scheme designed to increase driver visibility and reduce accidents on 30km in total of the A2 and A20 in Kent towards the port of Dover.
These road networks are heavily trafficked and prone to extreme local weather conditions including moving mist and fog resulting in varying visibility throughout the day and night. The road was notorious for numerous multiple vehicle accidents over the years which was often attributed to fog and poor night time visibility.
Traditional safety methods such as street lighting were not possible in this instance due to the stretches of road passing through a Site of Special Scientific Interest (SSSI) and an Area of Outstanding Natural Beauty (AONB). This status is given to specific areas which are designated to be safeguarded due to their precious landscape whose distinctive character and natural beauty are so outstanding that it is in the nation’s interest to protect them.
Clearview Intelligence flush road studs were deployed for this project run by Balfour Beatty Mott MacDonald, due to their proven track record of reducing night time accidents by over 70% and their nonintrusive nature and use of solar power, therefore not requiring power infrastructure which was perfect for the locality.
The SolarLite flush road studs use ‘smart’ technology which stores solar energy during the day. Built-in Light Emitting Diodes automatically illuminate from dusk to dawn, marking the road by up to 900 metres in advance, providing drivers with up to ten times more time to react to the layout of the road ahead.
This large project was completed in February 2010 and covered the deployment of over 21,000 studs on 30km of road and therefore required full night closures of sections of the A2 and A20. In order to minimise disruption there were short timescales for completion and sustainability was a key project driver due to the installation taking place in an Area of Outstanding Natural Beauty which has strict guidelines as to the type of actions that could be undertaken.
The use of SolarLite road studs minimised the impact on the environment with no infrastructure or civils work for installation and the use of solar energy to power the studs which do not create light pollution. This was a perfect solution for the area in reducing accidents whilst being sympathetic to the natural environment at the same time.
The project has been so successful from both a safety and environmental perspective that the benefits gained from the installation back in 2010 has warranted the redeployment of the SolarLite flush road studs during further road works. Stretches of road surfacing and repair commenced on sections of the A2 and A20 in Autumn 2013 and Balfour Beatty Mott McDonald ensured no compromise and that the same levels of road safety were maintained on this stretch of busy road by reinstating SolarLite flush road studs.
Smart, safe and sustainable solar powered road studs, proven to increase night time road safety. Providing a view of the road layout ahead in the driver's natural line of vision and well beyond the headlight beam of a vehicle.
With SolarLite Road Studs installed for the illumination of stretches on the M25 Motorway and also between the M2 and M20, Clearview Intelligence installed a quantity of 7,000 Road Studs between junctions 3, 4, 5 and 6 on the M40 Motorway providing ultrabright guidance to motorists around the clock.
Intelligent Hardwired Bi-Directional Road Studs installed at Blackwall Tunnel in Kent to create a contra-flow from the southern boar to the northern boar.
SolarLite Active Road Studs trialled in Sweden to see if they can withstand impact from snow ploughs and cope in extreme cold weather
Solarlite Road Studs have been installed along the extensive cycle path network in South Ayrshire creating an environmentally friendly and safe solution for the cycle path located in the wooded area.
SolarLite Active Road Studs reduce accident frequency from 7.3 per year to 2.3 per year by providing enhanced delineation on the A143 in Norfolk.
With SolarLite Road Studs installed for the illumination of stretches on the M25 Motorway and also between the M2 and M20, Clearview Intelligence installed a quantity of 7,000 Road Studs between junctions 3, 4, 5 and 6 on the M40 Motorway providing ultrabright guidance to motorists around the clock.
Slough Borough Council and their traffic signal consultants Atkins were looking for a more cost effective solution when upgrading multiple traffic signalised junctions along the very busy main A4 dual carriageway
Clearview Intelligence works on a wide variety of projects where ongoing maintenance is of huge importance to ensure continuous and accurate data collection. Good and reliable road network management is of paramount importance in our nation’s capital city where Clearview Intelligence equipment is key in ensuring smooth traffic flows.
Intelligent Hardwired Bi-Directional Road Studs installed at Blackwall Tunnel in Kent to create a contra-flow from the southern boar to the northern boar.