Slough Borough Council and their traffic signal consultants Atkins were looking for a more cost effective solution when upgrading multiple traffic signalised junctions along the very busy main A4 dual carriageway that included extending the Split Cycle Offset Optimisation Technique (SCOOT) detection coverage.
The project included 91 new detector locations in all, both on the main A4 dual carriageway and also a large number of intersecting side roads at eleven separate junctions. Existing ducting at these sites was limited, dated and in need of repair and therefore new ducting and trenching would have been required for nearly every one of the new SCOOT detector locations.
Atkins initiated a small trial of four Clearview Intelligence M100 wireless detection sensors installed directly in the middle of four existing SCOOT inductive loops, allowing a direct comparison of data directly from the detectors, at the Urban Traffic Management Control (UTMC) level and via the outstation transmission unit logs.
This clearly demonstrated that the M100 system delivered an equally reliable detection solution when compared to loops.
A key benefit of utilising the M100 wireless vehicle detection system is reduced installation costs, due to the elimination of additional ducting associated with SCOOT detection. In urban areas where SCOOT is more likely to be deployed, the sheer amount of existing utilities’ pipelines/cabling generally around means such ducting would need to be hand dug, further increasing the potential costs especially with the required locations and distances from the junction of SCOOT detectors.
Additionally, as each sensor was installed quickly and easily during the daytime, even on junctions on busy main arterial routes such as the A4 in Slough, road users and residents experienced considerably less disruption to traffic and any need for night time working and long periods of traffic management was completely eliminated.
Following successful trial, the M100 system was implemented at all 91 SCOOT detectors across the eleven junctions within only six days at off peak restricted hours of the day.
This enabled Slough Borough Council to realise substantial cost savings equating to tens of thousands of pounds, benefitting from greatly reduced installation times, elimination of capital outlay for ducting/trenching, significantly reduced traffic management requirements and therefore reduced traffic congestion/disruption during the works.
Accurate and easy to install wireless vehicle detection system. A cost effective alternative to inductive loops suitable for a range of applications, including traffic signal control systems such as MOVA and SCOOT and for vehicle detection in MIDAS applications.
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Slough Borough Council and their traffic signal consultants Atkins were looking for a more cost effective solution when upgrading multiple traffic signalised junctions along the very busy main A4 dual carriageway
Clearview Intelligence works on a wide variety of projects where ongoing maintenance is of huge importance to ensure continuous and accurate data collection. Good and reliable road network management is of paramount importance in our nation’s capital city where Clearview Intelligence equipment is key in ensuring smooth traffic flows.
Vehicle activated dynamic signage used to alert drivers to queueing traffic on the road ahead – helping them to avoid rear end shunt accidents.
Weigh In Motion system enables re-opening of the Newcastle High Level Bridge.
Three major 1st class routes were identified for route safety solutions by our local partner in Slovakia.
The Shoreham Road forms a U-shaped link road providing access to air-freight warehousing associated with the Airport. In context, the top of the ‘U’ is in the north, the east and west outer sides are warehouses which are used to transfer freight between ‘airside’ (cargo planes) and ‘landside’ (HGVs).
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Cambridgeshire County Council, in partnership with Milestone Infrastructure decided that all studs should be fully renewed.
With SolarLite Road Studs installed for the illumination of stretches on the M25 Motorway and also between the M2 and M20, Clearview Intelligence installed a quantity of 7,000 Road Studs between junctions 3, 4, 5 and 6 on the M40 Motorway providing ultrabright guidance to motorists around the clock.