Let us help you
Call +44 (0)1908 088008 or email us
The Tyne Tunnel runs under the River Tyne to connect the towns of Jarrow on the south bank with Howdon on the north. The original tunnel opened in 1967 with a subsequent tunnel opening in 2011. The new tunnel was opened to handle the rise in traffic and improve safety by having traffic in each tunnel travelling in only one direction.
TT2 are responsible for the design, build, part-finance and operation of the new vehicle tunnel and other developments associated with the New Tyne Crossing project. They operate all Tyne Tunnels and will do so until 2037.
Customer experience is paramount to TT2. They had therefore been seeking a solution to provide accurate journey time information to their users, either via their website, roadside Variable Message Signs (VMS) or a newly developed smartphone app.
Crucially for TT2, ANPR and Bluetooth systems can only be deployed on roads under the operator’s jurisdiction. TT2 however, wanted to understand journey times not only on their routes but also the surrounding area.
Traditional journey time management systems use ANPR cameras or Bluetooth detectors installed at the roadside to detect passing traffic. Deploying roadside infrastructure such as this is costly to both install and maintain. It also requires continued power and data transfer, which increases ongoing costs further.
In contrast, Clearview’s Journey Time Monitoring application uses crowdsourced data to provide accurate and reliable journey time information. As a result, it is much more cost effective and flexible than systems based on hard infrastructure. It can also be made operational far more quickly.
TT2 were impressed with the speed of deployment, flexibility and reliability of the system and following a trial period, decided to implement it. The system’s comprehensive APIs made integration with other platforms (and the smart phone app) simple and straightforward and TT2 remain impressed by the inbuilt reporting and alerts system.
The unique combination of comprehensive and flexible alerts as well as robust reporting, allow TT2 operations staff to be aware of issues as they happen. They can further analyse journey times around the tunnels over time periods with integrated charts, reports and heatmaps, all of which are easily exported to Excel for distribution and further analysis.
Equipped with accurate and timely journey time information, TT2 are now able to plan maintenance activities when they know it will have the minimum impact on the road network while sharing journey time information with their users, so that they can plan the most efficient route and their journey time expectations are consistently met.
The Insight Journey Time Monitoring application from Clearview has proven to be just the solution we needed to help our customers understand their journey to and through the Tyne Tunnels. The system produces very valuable and useful data for both TT2 and road users. Clearview has supported us in getting up and running with the system, which we are now using with confidence.
An online application that aids the monitoring, visualisation and analysis of traffic journey times. Removing the need to deploy sensors at the roadside, the application utilises crowdsourced data to deliver reliable and accurate journey time information.
In 2010, Clearview Intelligence installed 868 Hardwired Bi-Directional Road Studs in the Hindhead Tunnel, Surrey – a project commenced by the Highways Agency in 2007 to remove a major source of congestion around the A3/A287 junction
Wireless Vehicle Detection smoothing traffic flow across 14 locations along the M8 M73 M74 motorway network.
Improving user experience of the Tyne Tunnels through flexible journey time monitoring.
Journey Time Monitoring application delivers accurate average speed information through roadworks without the cost, time and risk of deploying infrastructure at the roadside.
Three major 1st class routes were identified for route safety solutions by our local partner in Slovakia.
The Shoreham Road forms a U-shaped link road providing access to air-freight warehousing associated with the Airport. In context, the top of the ‘U’ is in the north, the east and west outer sides are warehouses which are used to transfer freight between ‘airside’ (cargo planes) and ‘landside’ (HGVs).
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Cambridgeshire County Council, in partnership with Milestone Infrastructure decided that all studs should be fully renewed.
With SolarLite Road Studs installed for the illumination of stretches on the M25 Motorway and also between the M2 and M20, Clearview Intelligence installed a quantity of 7,000 Road Studs between junctions 3, 4, 5 and 6 on the M40 Motorway providing ultrabright guidance to motorists around the clock.