Let us help you
Call +44 (0)1908 088008 or email us
The A702 runs from Edinburgh to St. John’s Town of Dalry in Dumfries and Galloway with the village of Coulter roughly halfway between the two. Travelling through Coulter on the A702 involves crossing a bridge with a narrow carriageway. There is a sharp bend at the bridge with a side road joining the A702 shortly after.
This layout means there is a risk of collisions and there have been several incidents. Strikes to the parapets on the bridge were a regular occurrence, leading to risk to road users.
Amey, on behalf of Transport Scotland, sought a road safety solution to heighten awareness of the risk to road users and increase safety at the bridge.
Clearview Intelligence has worked in partnership with Transport Scotland and Amey on many innovative road safety schemes and was once again able to develop a bespoke solution to the issues faced on Coulter Bridge.
Using our established vehicle count and classification system we developed a solution that detects and classifies vehicles as they approach the bridge as well as determining their speed. Dynamic warning signs were deployed ahead of the bridge to provide drivers with specific warnings.
Using vehicle classification in combination with dynamic signage allows warning messages to be tailored to the specific issue on the bridge at that time.
If a large vehicle is detected on the approach to the bridge, traffic on the opposite side of the bridge will see a warning that there are oncoming vehicles in the middle of the road. This raises awareness allowing drivers to drive with due care and attention.
A driver approaching the bridge too fast will receive a message warning them to slow down. The threshold at which this warning is presented varies depending on the vehicle type, so a large vehicle will be warned to slow down at lower speeds than a car. This level of personalisation increases the effectiveness of the warnings as drivers only see a warning when necessary, meaning they do not become blind to it.
A further warning was developed to be used only when the school day at the village primary school starts and ends. This warns drivers of the part time speed limit and to slow down and be aware of children leaving or arriving at the school.
Unlike static signs or vehicle activated signs that are presented to any passing vehicle, drivers do not become complacent to these dynamic warning signs. Because they accurately reflect the situation on the road and do not alert drivers unnecessarily, the behaviour change that they encourage is far greater.
Email us to discuss a similar scheme on your network.
Designed to meet the demands of traffic data collection projects in various locations, the M680 detects vehicles as they pass over inductive loops embedded in the road surface. With unsurpassed accuracy, reliability and versatility the M680 can be used in both slow and fast moving traffic environments, making it perfect for both parking and general traffic applications.
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Clearview Intelligence provided vehicle count and classification with variable speed awareness and vehicle activated signs (VAS) across six locations on the A75 Stranraer to Gretna Green to encourage speed compliance and change driver behaviour.
Route safety scheme alerting oncoming traffic to vehicles turning ahead while also encouraging speed compliance on the A701
Following a number of accidents at the junction where the A76 and B744 meet, a vehicle detection system and vehicle activated signs were used to reduce speeding and increase safety at the junction.a
Clearview Intelligence worked alongside Kier and Carnell to design a long vehicle detection system that would operate across the junction and trigger the VAS further up the road.
Reducing accidents by combining traffic signals and Vehicle Activated Signs (VAS), while prioritising ambulances at Borders General Hospital.
Three major 1st class routes were identified for route safety solutions by our local partner in Slovakia.
The Shoreham Road forms a U-shaped link road providing access to air-freight warehousing associated with the Airport. In context, the top of the ‘U’ is in the north, the east and west outer sides are warehouses which are used to transfer freight between ‘airside’ (cargo planes) and ‘landside’ (HGVs).
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Cambridgeshire County Council, in partnership with Milestone Infrastructure decided that all studs should be fully renewed.
With SolarLite Road Studs installed for the illumination of stretches on the M25 Motorway and also between the M2 and M20, Clearview Intelligence installed a quantity of 7,000 Road Studs between junctions 3, 4, 5 and 6 on the M40 Motorway providing ultrabright guidance to motorists around the clock.