During the summer months Ashton Gate Stadium in Bristol hosts a number of large attendance concerts, creating spikes in evening traffic flows around the city road network.
Last summer, when faced with four concerts in quick succession, Bristol City Council decided to adjust their SCOOT signal phasing times around the stadium area to help concert goers leave the venue in the quickest way possible. In order to optimise the effects of the SCOOT changes, the council wished to monitor journey times on all
routes around the venue itself.
Existing fixed ANPR journey time infrastructure was only able to monitor some but not all of the anticipated journey routes, so Bristol City Council turned to Clearview’s Insight® Journey Time application as the solution to complete the data picture.
The team in Bristol City Council were able to quickly and easily set up the Clearview Intelligence Insight Journey Time spans in a matter of minutes, completing the full coverage of the main routes around the Ashton Gate Stadium.
When monitoring both the Clearview and ANPR journey information it was seen that when traffic exited the concert through the adjusted SCOOT controlled junctions their journey times were improved, compared to later times when SCOOT reverted back to its original phasing schedule. This led the traffic operations team to extend the time in use of the revised phasing times for the second concert onwards.
The team continued to monitor the data using the immediately available graphical reports and noted journey times exiting the concert was improved in line with the extended SCOOT operation times.
Once the concerts were over Bristol City Council were then able to easily re-deploy the journey spans to monitor routes around other events such as the Glastonbury festival weekend and Filton Airfield.
Their planning team have also used the spans to help model the effects of proposed road changes.
An online application that aids the monitoring, visualisation and analysis of traffic journey times. Removing the need to deploy sensors at the roadside, the application utilises crowdsourced data to deliver reliable and accurate journey time information.
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Slough Borough Council and their traffic signal consultants Atkins were looking for a more cost effective solution when upgrading multiple traffic signalised junctions along the very busy main A4 dual carriageway
Clearview Intelligence works on a wide variety of projects where ongoing maintenance is of huge importance to ensure continuous and accurate data collection. Good and reliable road network management is of paramount importance in our nation’s capital city where Clearview Intelligence equipment is key in ensuring smooth traffic flows.
Vehicle activated dynamic signage used to alert drivers to queueing traffic on the road ahead – helping them to avoid rear end shunt accidents.
Weigh In Motion system enables re-opening of the Newcastle High Level Bridge.
Three major 1st class routes were identified for route safety solutions by our local partner in Slovakia.
The Shoreham Road forms a U-shaped link road providing access to air-freight warehousing associated with the Airport. In context, the top of the ‘U’ is in the north, the east and west outer sides are warehouses which are used to transfer freight between ‘airside’ (cargo planes) and ‘landside’ (HGVs).
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Cambridgeshire County Council, in partnership with Milestone Infrastructure decided that all studs should be fully renewed.
With SolarLite Road Studs installed for the illumination of stretches on the M25 Motorway and also between the M2 and M20, Clearview Intelligence installed a quantity of 7,000 Road Studs between junctions 3, 4, 5 and 6 on the M40 Motorway providing ultrabright guidance to motorists around the clock.