The A14 is part of the UK’s strategic road network and is a critical route for access to the East of England as well as for freight traffic as they head to and from the continent. The road runs through Highways England’s East Area (formally Areas 6 and 8) and has been undergoing maintenance and improvement works. This work has been led by Kier Highways, supported by their key infrastructure partner MWay Comms.
Along the A14, the MIDAS system in operation relied on inductive loops as the way of vehicle detection. These existing loops were all defective and required replacing across all lanes.
The challenge was that the loop installation would require a complete closure of that section of the road, resulting in a major diversionary route needing to be put in place. This would have potentially caused over an hour of additional journey times for the road users.
The resultant traffic disruption and additional journey times presented a significant customer impact for Highways England, so Kier and MWay Comms looked for alternative solutions to avoid such disruption.
MWay Comms have worked with Clearview Intelligence over a number of years, so when they were approached by Kier about the diversionary challenges being faced, they were quick to suggest using M100 wireless vehicle detection as a viable alternative to inductive loops.
M100 magnetometers are small sensors placed in the centre of a lane to detect passing vehicles and communicate wirelessly into the MIDAS Outstation. This means the sensors are not in the wearing course of the road. MWay Comms were able to very quickly (approximately 15 mins per stud) install all the necessary studs, along with roadside access points and repeater units across the ten sites. Efficiencies in the solution delivery also included the pre-build of an alternative bracket for the pole mounts resulting in a further £30k worth of savings.
Importantly, because the studs are individually installed it meant the work only required single lane closures. This removed the need for full road closures and the associated costs of having large diversions in place, solving Highways England’s customer experience challenge.
The data produced by the magnetometers was then checked and verified against historical inductive loop data and calibrated to be highly accurate, meeting the needs of the A14 MIDAS system.
Accurate and easy to install wireless vehicle detection system. A cost effective alternative to inductive loops suitable for a range of applications, including traffic signal control systems such as MOVA and SCOOT and for vehicle detection in MIDAS applications.
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Slough Borough Council and their traffic signal consultants Atkins were looking for a more cost effective solution when upgrading multiple traffic signalised junctions along the very busy main A4 dual carriageway
Clearview Intelligence works on a wide variety of projects where ongoing maintenance is of huge importance to ensure continuous and accurate data collection. Good and reliable road network management is of paramount importance in our nation’s capital city where Clearview Intelligence equipment is key in ensuring smooth traffic flows.
Vehicle activated dynamic signage used to alert drivers to queueing traffic on the road ahead – helping them to avoid rear end shunt accidents.
Weigh In Motion system enables re-opening of the Newcastle High Level Bridge.
Three major 1st class routes were identified for route safety solutions by our local partner in Slovakia.
The Shoreham Road forms a U-shaped link road providing access to air-freight warehousing associated with the Airport. In context, the top of the ‘U’ is in the north, the east and west outer sides are warehouses which are used to transfer freight between ‘airside’ (cargo planes) and ‘landside’ (HGVs).
The A50 is a strategic east to west connection between the M6 and M1
The Stoneferry Corridor is a primary route originating north of Hull, with strategic connections to the Port of Hull, City Centre, and Eastern areas of Hull. It is heavily dominated by industry, HGV activity and businesses, with pockets of residential, retail, and educational buildings.
Cambridgeshire County Council, in partnership with Milestone Infrastructure decided that all studs should be fully renewed.